Quality Control for CNC Machined Parts

See how drawing requirements are checked during machining and before dispatch, and what inspection records you can request.

Request a quote

An operator at the coordinate measuring machine in the LatheTime inspection room

Drawing review and inspection planning

Identify the approved revision, critical dimensions, mating fits, finish and documentation needs with the RFQ. Agree any first-article approval or shipment hold point before placing the order.

In-process checks

Checks during machining can verify features such as bore size and shoulder location before work proceeds. Applicable threaded features are checked with suitable gauges against the agreed specification.

Final inspection and packing

The batch is checked against the drawing before packing. If you need a dimensional report, first-article inspection or material documentation, include the required format and scope in the quote request.

Explore further

Download the LatheTime capabilities catalog

Request a machining quote

Share your drawing, material, quantity and inspection requirements for engineering review.

Send your drawing